About Andrea

This author has not yet filled in any details.
So far Andrea has created 11 blog entries.

A consortium led by IRD Engineering will prepare the detailed design of the SEETO Route 2a, section Banja Luka – Ugar – Lasva in Bosnia and Herzegovina

2020-06-10T12:25:26+02:00June 10th, 2020|News|

A consortium led by #IRDEngineering has resulted awarded with a new contract in Bosnia and Herzegovina. The project is aimed at the preparation of the