Project Details
Client:
ANAS S.p.A.
Country:
Italy
Practice Area:
Transport Infrastructure
Services:
Engineering Design
Detailed Design of the New SS12 Alternative Route South of Verona

IRD Engineering is acting as the Designer within a Design and Build contract (Appalto Integrato) financed by ANAS S.p.A., responsible for the preparation of the detailed design (Progetto Esecutivo) of the new SS12 (Strada Statale dell’Abetone e del Brennero) alternative route. The project involves the construction of an approximately 14.4 km road bypass connecting the locality of Buttapietra to the southern ring road of Verona, crossing the municipalities of Verona, Castel d’Azzano, Buttapietra, Vigasio and Isola della Scala.
The new alignment is intended to separate national through-traffic from local traffic, thereby reducing congestion in urban areas, decreasing urban pollution and improving mobility and road safety along one of the busiest transport corridors south of Verona.
The main alignment extends for approximately 14.4 km and includes three full interchanges (Ca’ Brusà, Castel d’Azzano and Vigasio) and two partial interchanges serving the Isola della Scala area. The road infrastructure is complemented by 15 roundabouts and a network of secondary roads designed to maintain continuity of urban, industrial and agricultural connections.
The project also includes several major structures, notably the San Giorgio Viaduct, approximately 740 m long, and the Castel d’Azzano and Vigasio Bridges, each approximately 70 m long, as well as smaller bridges crossing the local hydraulic network, including Fosso Campagna, Casara and Basilea. Additional structures include overpasses in the localities of La Rizza, Ca’ Brusà and Ca’ di David.
IRD Engineering’s responsibilities include:
- Detailed road design of the main alignment of the new SS12 alternative route.
- Detailed design of the major structures along the main alignment, including viaducts and bridges.
- Preparation of the geological and geotechnical investigation report.
- Design of health and safety measures relating to IRD Engineering’s assigned scope of works.
Through its design activities within the Joint Venture, IRD Engineering contributes to the development of a new strategic road connection aimed at improving traffic distribution, reducing congestion and enhancing mobility and road safety in the southern Verona area.